Every job tells a story, and we’re proud of the work we leave behind. From remote lease builds to complex reclamation projects, what you’ll see here reflects the grit, care, and know-how our crew brings to every site.
We don’t just move dirt, we move projects forward with integrity, experience, and a commitment to doing things right. These projects speak for themselves, field-tested solutions and results that stand the test of time in the real world.

Former Wellsite
Southern Alberta (Winter/Spring 2025)
-
Build out an emergency response plan in collaboration with oil company, consulting firm and local emergency services.
-
Establish a journey management plan with local emergency services and trucking sub contractor
-
Provide manpower and equipment to re-route local gas co-op pipeline to facilitate workplan
-
Prepare and implement traffic accommodation plan
-
Build alternate road from site to allow for local and heavy truck traffic to travel safely
-
Procure pilot trucks to assist in the daily safe transport of large heavy loads on narrow roads
-
Excavate and landfill 22,000m3 of impacted material
-
Secure clean fill from landowner and coordinate pipeline protection measures to haul fill to site
-
Backfill 18,000m3 of material sourced from landowner
-
Recontour site, replace soils and prepare for seeding. Revegetate site and install erosion control
Wellsite
Central Alberta Wellsite (Winter 2024/2025)
-
Dismantle and store all infrastructure and historical displays
-
Strip site and store all topsoil offsite
-
Install chain link fence around perimeter of site for public protection
-
Excavate and sort 18,000m3 of soil
-
Backfill all clean soil
-
Landfill 11,600m3 of impacted material
-
Import 11,600m3 of clean backfill, place and compact (including salvaged topsoil)
-
Clean up site and improve roads


Former Battery Site
Central Alberta (Winter 2023/2024)
-
Excavate, and sort 11,000m3 of hydrocarbon and salinity-impacted soils
-
Haul impacted material to the landfill
-
Cut and cap pipelines. Install pipeline plugs and tags.
-
Excavate, pull and haul pipe to local metal recycler
-
Excavate around pipelines and backfill
-
Import clean, local backfill, place and compact. Contour site.
-
Screen areas where gravel was mixed with topsoil.
-
Replace topsoil onsite
-
Paratill site
Southern Alberta Gas Plant
Southern Alberta
Oak Creek Earthworks Ltd decommissioned, backfilled and contoured the Acid Water Treatment Ponds associated with a sulphur block that was on site up until 2010.
-
Build large containment area for impacted materials
-
Dewater pond
-
Excavate/dredge sludge out of ponds and haul to containment area
-
Remove all chain link fence and recycle all reusable materials and dispose of waste
-
Remove pond liner, re-use a portion for a new containment area and dispose of the remainder
-
Excavate any sulphur impacts >4% by volume and stockpile
-
Remove all remaining infrastructure associated with former ponds and treatment system (concrete, cable, pilings) and recycle or dispose of materials
-
Backfill former pond areas using 75,000 tonne of fill provided by Oak Creek
-
Remove section of former rail line from sulphur transport, recycle steel, dispose of rail ties
-
Build road and turnaround to allow trucking of sulphur off site
-
Contour site to shed water


Alberta Gas Plant
Central Alberta (Fall 2021)
-
Spray out grass and weeds in multiple areas
-
Break up and haul large piles of downed trees to town yard for firewood, dispose of waste at landfill
-
Dewater multiple excavations from a previous earthworks program and backfill with material from onsite and imported sources
-
Disc then strip multiple areas on site and stockpile soil
-
Screen all topsoil piles to remove rock, metal and debris
-
Contour areas to fit with surrounding topography
-
Prepare sub-base for parking lots and contour areas for future soccer fields
-
Install culverts to facilitate water flow with new site contour
-
Replace screened topsoil on all areas contoured previously and seed
-
Install erosion control
Former Well Site
Central Alberta (Winter 2024-2025)
-
Strip site and excavate 10,600m3 of impacted soils and haul to landfill
-
Import 10,600m3 of clean fill, compact and contour site
-
Cut, cap and remove 2 pipelines from beneath access road
-
Remove 800m of access road and reclaim using salvaged sub soil and topsoil
-
Recycle pipe and haul salvaged gravel to landowner for reuse